09

2022

-

09

What problems should be paid attention to when installing the blind plate?

Author:


Before maintenance, the closed equipment should be cut off with a blind plate to cut off the inlet and outlet pipelines connected to it, so that the operating equipment is completely isolated from the equipment to be repaired. This blind plate must be able to withstand the working pressure of the pipeline, otherwise the pipeline needs to be disassembled , or install a vent pipe and a pressure gauge between the blind plate and the valve, and send a special person to guard it to avoid the pressure in the pipe gradually rising due to the leakage of the valve, and the blind plate will be crushed.

What are the precautions for adding and removing blind plates?

(1) The work of adding and dismantling the blind plate shall be in charge of a special person;

(2) The blind plate must have a uniform number, and the addition and removal of the blind plate must be recorded, and a diagram of the addition and removal of the blind plate must be drawn;

(3) The staff who add and remove the blind plate should be relatively fixed. In principle, whoever adds the blind plate is responsible for removing it to prevent omission. When adding or removing the blind plate, the staff must sign on the chart, indicating the addition and removal. Blind plate situation;

(4) The staff should have corresponding safety education and do a good job of safety protection. The selection of the blind plate should meet the technical requirements. In principle, it should be added to the rear flange of the incoming valve, and gaskets should be added on both sides of the blind plate. .

(5) The purpose of adding and removing blind plates is to do a good job of contacting relevant devices and departments.